Happy New Year all, this is the year we will see our newest build Union Wharf operational! Read more to see how it’s getting on below.
The Residents lobby amenity area on the ground floor of Block A has excelled over the course of the last month. The feature wall tiles are now being installed and the marble worktops for the reception desk have been fitted.
The Block A balconies have made a significant jump in progress. As the scaffolding comes down the balconies have become visible to the top half of the building. All that’s left to do now is instillation of the decking to complete the balconies.
The block A ground floor residents lobby is making such good progress. We have started preparing for the installation of the revolving door and the remaining glass to complete the area. Above is a picture of how the glass glazing will look when complete!
Throughout December, there has been significant changes on the roofs of both Block A and B resulting in the roof terraces being able to soon start being installed. The decking and turf will be going down, creating walkways and recreation areas on both roofs. Above is a 3D model of one of the terraces on Block B roof.
Leave a Comment